Skip to content

What are you looking for?


You may also like

General Electric DS200EXPSG1ACB Power Supply BoardGeneral Electric DS200EXPSG1ACB Power Supply BoardGeneral Electric DS200EXPSG1ACB Power Supply Board
General Electric DS200EXPSG1ACB Power Supply Board
General Electric DS200EXPSG1ACB Power Supply Board
General Electric DS200EXPSG1ACB Power Supply Board

General Electric DS200EXPSG1ACB Power Supply Board


Only 10 left - Selling fast

PRODUCT SKU : DS200EXPSG1ACB

PRODUCT TYPE : Power Supply Boards

PRODUCT VENDOR : General Electric


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

Configured for power regulation and system diagnostics within Mark V turbine control environments, the GE DS200EXPSG1ACB (DS200EXPSG1 Power Supply Board) provides direct physical electrical distribution and status monitoring.

Hardware Specifications

Parameter Specification
Model DS200EXPSG1ACB
Brand General Electric
Core Components 1 LED, 3 fuses, 1 reset button, 3 9-pin connectors

Industrial Control & Firmware Compatibility

The DS200EXPSG1ACB manages local power distribution utilizing a 5C060 programmable logic device to govern system regulation. For operational consistency, the board supports integration into the Mark V Speedtronic architecture, ensuring backplane bus communication velocity remains stable during high-demand turbine control cycles. The onboard diagnostic LED serves as a primary status indicator; steady green illumination confirms successful completion of power-on self-tests. While the board includes a Berg-type JP1 jumper for factory testing, it does not support field-configurable firmware flash updates; system logic remains fixed within the pre-programmed 5C060 device.

Frequently Asked Questions

Q: What does it indicate when the onboard green LED fails to illuminate?

A: A non-illuminated LED signifies that the board has not passed startup diagnostic tests or is experiencing a power fault. Technicians should utilize the designated onboard test points to verify individual circuit voltages as outlined in the GEI-100168 instruction manual.

Q: Can the JP1 jumper be modified to change board operation?

A: No. The JP1 Berg-type jumper is strictly for manufacturing test purposes. Any attempt to modify or move this jumper may disrupt the factory-set logic and is not permitted for field application.

Field Installation Guidelines

  • Power Isolation: Before installation or removal, remove all power sources from the assembly. Verify zero voltage potential at all connection points to prevent damage to voltage-sensitive integrated circuits.
  • Connector Management: Disconnect all 9-pin connectors in accordance with the sequences defined in the GEI-100168 technical manual. Ensure connectors are seated firmly upon reinstallation to prevent intermittent power fluctuations.
  • Handling Precautions: The board contains sensitive surface-mount components. Handle by the edges or mounting hardware to avoid electrostatic discharge (ESD) or accidental contact with hazardous surface voltages present on the base PCB.
  • Diagnostic Verification: Following installation, monitor the green LED status. Use the board's test points to validate that output voltage rails align with system requirements before restoring full control logic to the turbine processor.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Executing a PLC System Site Acceptance Test (SAT): The Definitive Engineering Guide

Executing a PLC System Site Acceptance Test (SAT): The Definitive Engineering Guide

The transition of a Programmable Logic Controller (PLC) cabinet from a controlled factory floor to a volatile plant environment represents a critical milestone in factory automation. While a Factory Acceptance Test (FAT) validates standalone hardware compliance under ideal conditions, it cannot replicate real-world process dynamics. Therefore, deploying an industrial automation system requires a rigorous Site Acceptance Test (SAT) to verify total loop integrity, field wiring wiring metrics, and process control parameters before final customer handover.

Read more
Advanced Integration: Master Protocol for VFD Commissioning and Testing

Advanced Integration: Master Protocol for VFD Commissioning and Testing

Deploying variable frequency drives (VFDs) requires precise execution during the initial commissioning phase. Junior automation engineers often find the first power-up sequence intimidating. However, following a rigorous engineering framework ensures equipment safety and system reliability. Proper startup procedures protect both the drive electronics and the connected motor.

Read more
Optimizing Factory Automation: The Definitive Guide to VFD Preventive Maintenance

Optimizing Factory Automation: The Definitive Guide to VFD Preventive Maintenance

Variable Frequency Drives (VFDs) serve as critical assets in modern industrial automation. These power electronic devices regulate electric motors by adjusting the supplied frequency and voltage. Consequently, industries utilize VFDs to reduce energy consumption and optimize process control. Major manufacturers like Siemens, ABB, and Yaskawa design highly efficient drives. However, sustained efficiency requires a rigorous preventive maintenance program.

Read more