Skip to content

What are you looking for?


You may also like

GE VMIACC-5595-208 Reflective Memory Hub AssemblyGE VMIACC-5595-208 Reflective Memory Hub AssemblyGE VMIACC-5595-208 Reflective Memory Hub Assembly
GE VMIACC-5595-208 Reflective Memory Hub Assembly
GE VMIACC-5595-208 Reflective Memory Hub Assembly
GE VMIACC-5595-208 Reflective Memory Hub Assembly

GE VMIACC-5595-208 Reflective Memory Hub Assembly


Only 10 left - Selling fast

PRODUCT SKU : VMIACC-5595-208

PRODUCT TYPE : Reflective Memory Modules

PRODUCT VENDOR : General Electric


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

Configured for high-speed fiber-optic node interconnection and deterministic data routing in real-time control networks, the GE VMIACC-5595-208 (VMIACC-5595 Reflective Memory Hub Assembly) provides direct physical signal distribution across distributed memory nodes.

Hardware Specifications

Parameter Specification
Model VMIACC-5595-208
Brand GE
Origin USA
Weight 3 kg
Dimensions 241 x 194 x 152 mm
Operating Temp Standard operational thermal envelope
Power Consumption Universal internal power supply driven
Product Type Reflective Memory Modules
Data Rate 2 Gb/s fiber-optic link rate
Port Capacity Up to 8 Small Form-Factor Pluggable (SFP) transceiver ports
System Scalability Cascading architecture supporting up to 256 nodes
Maximum Cable Distance Configurable for link distances up to 10 km
Management Interfaces 1x Ethernet port, 1x RS-232 serial port

Backplane Bus Communication Velocity & Deterministic Networks

The VMIACC-5595-208 hub maintains zero-latency data packet switching across fiber-optic nodes to protect deterministic loop timing in real-time control applications. By serving as an active optical star hub, internal switching circuits manage 2 Gb/s data streams without adding host CPU overhead or bus arbitration delays. The deterministic network architecture ensures synchronous data replication across up to 256 cascaded nodes, maintaining sub-microsecond cross-node update velocity across optical line lengths up to 10 km.

Frequently Asked Questions

Q: How does the hub handle node expansion beyond the onboard 8 SFP ports?

A: Multiple VMIACC-5595 hub assemblies can be cascaded via SFP interconnect links to expand the network topology up to a maximum limit of 256 active nodes.

Q: What remote management access interfaces are provided on the hardware enclosure?

A: Hardware status monitoring and system configuration are accessed locally or remotely via dedicated onboard Ethernet and RS-232 serial communications ports.

Q: Is hot-swapping or replacing individual SFP optical transceivers supported during operation?

A: SFP transceivers can be serviced according to standard optical port insertion rules, provided the active ring loop configuration is bypass-managed via remote administrative commands.

Field Installation Guidelines

  1. Mount the 241 x 194 x 152 mm hub assembly securely inside an industrial enclosure using structural panel fasteners to prevent vibration stress.
  2. Connect the AC power mains to the internal universal power supply terminal block, verifying solid ground bonding to the enclosure chassis earth bar.
  3. Insert compatible SFP transceivers into designated fiber ports and verify clean optical fiber end-faces before latching LC/SC connectors.
  4. Route optical fiber cables with a minimum bend radius of 30 mm, maintaining physical separation from high-voltage AC power wiring to prevent sheath abrasion.
  5. Connect an RS-232 serial cable or Ethernet patch cable to the management port to initialize port routing configurations and monitor link integrity flags.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Demystifying the 5 Levels of Industrial Automation Architecture

Demystifying the 5 Levels of Industrial Automation Architecture

Modern manufacturing relies on structured communication hierarchy to bridge physical shop-floor hardware with enterprise management software. This framework, commonly known as the Automation Pyramid, establishes how data flows between field devices, logic controllers, and corporate IT networks. Understanding these five distinct levels helps engineers and plant managers optimize system operations, reduce downtime, and implement seamless factory automation solutions.

Read more
Transforming Shop Floor Data into Actionable Insights: A Deep Dive into MES

Transforming Shop Floor Data into Actionable Insights: A Deep Dive into MES

Manufacturing Execution Systems serve as the digital backbone of modern factory floors. Positioned at Level 3 of the ISA-95 automation pyramid, MES links enterprise resource planning with real-time shop floor control systems. Today, industrial operators rely on MES software to bridge operational strategy with physical production execution.

Read more
Managed Switch vs. Unmanaged Switch: Industrial Ethernet Architecture

Managed Switch vs. Unmanaged Switch: Industrial Ethernet Architecture

Industrial Ethernet forms the backbone of factory automation. Selecting the right switch architecture determines system uptime, data throughput, and OT cyber resilience. This technical guide evaluates managed vs. unmanaged switches, analyzing operational differences, security controls, and selection criteria.
Read more