Skip to content

What are you looking for?


You may also like

GE IS200EAUXH1AAA TMR Auxiliary Function ModuleGE IS200EAUXH1AAA TMR Auxiliary Function ModuleGE IS200EAUXH1AAA TMR Auxiliary Function Module
GE IS200EAUXH1AAA TMR Auxiliary Function Module
GE IS200EAUXH1AAA TMR Auxiliary Function Module
GE IS200EAUXH1AAA TMR Auxiliary Function Module

GE IS200EAUXH1AAA TMR Auxiliary Function Module


Only 10 left - Selling fast

PRODUCT SKU : IS200EAUXH1AAA

PRODUCT TYPE : I/O Interface Modules

PRODUCT VENDOR : General Electric


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

Configured for auxiliary I/O interfacing in EX2100E excitation control systems, the GE IS200EAUXH1AAA (IS200EAUXH1) TMR Auxiliary Function Module provides direct physical/electrical execution.

Hardware Specifications

Parameter Specification
Model IS200EAUXH1AAA
Brand GE
Origin USA
Weight Approximately 1.81 kg
Component Configuration 7 relays, 8 jumpers (J1-J8)

Industrial Control and Drives Characteristics

The IS200EAUXH1AAA functions as an Exciter Auxiliary I/O Interface Board within the EX2100E excitation control architecture. The module design incorporates a series of jumpers (J1-J8) to facilitate hardware-level configuration and seven onboard relays for discrete switching operations. Deterministic network performance within the EX2100E system relies on the integrity of this module's signal paths, which interface with the controller backplane to manage auxiliary I/O requirements. The PCB features conformal coating to enhance durability against environmental contaminants in industrial conditions. I/O density scaling and firmware flash compatibility are maintained through the module's integration with the primary control processors, ensuring that auxiliary functions are synchronized with the main excitation control loops.

Frequently Asked Questions

Q: Does the IS200EAUXH1AAA support hot-swapping?

A: No. Due to its role in the auxiliary I/O interface and the presence of relay-driven control circuits, the module must not be removed or inserted while the EX2100E system is energized. De-energize the associated power circuits prior to any maintenance activity.

Q: How should the jumper settings (J1-J8) be configured during replacement?

A: Jumper settings must match the configuration of the original board exactly. Before removing the existing module, document the position of each jumper (J1-J8) and replicate this configuration on the replacement unit to ensure compatibility with the existing control logic and I/O assignments.

Field Installation Guidelines

  • Static Protection: Use an ESD-safe workstation and wrist strap when handling the IS200EAUXH1AAA to protect sensitive onboard components and the identification device.
  • Mechanical Installation: Secure the board using the pre-drilled mounting holes. Ensure that the module is firmly seated to prevent vibration-induced loosening, which may impact the relay and jumper connection integrity.
  • Visual Inspection: Conduct a pre-installation inspection to verify that no jumpers were displaced during shipping and that all relay seating is correct.
  • Cable Management: Ensure that field wiring connected to the module is supported by strain relief mechanisms to prevent physical stress on the board’s termination points.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Executing a PLC System Site Acceptance Test (SAT): The Definitive Engineering Guide

Executing a PLC System Site Acceptance Test (SAT): The Definitive Engineering Guide

The transition of a Programmable Logic Controller (PLC) cabinet from a controlled factory floor to a volatile plant environment represents a critical milestone in factory automation. While a Factory Acceptance Test (FAT) validates standalone hardware compliance under ideal conditions, it cannot replicate real-world process dynamics. Therefore, deploying an industrial automation system requires a rigorous Site Acceptance Test (SAT) to verify total loop integrity, field wiring wiring metrics, and process control parameters before final customer handover.

Read more
Advanced Integration: Master Protocol for VFD Commissioning and Testing

Advanced Integration: Master Protocol for VFD Commissioning and Testing

Deploying variable frequency drives (VFDs) requires precise execution during the initial commissioning phase. Junior automation engineers often find the first power-up sequence intimidating. However, following a rigorous engineering framework ensures equipment safety and system reliability. Proper startup procedures protect both the drive electronics and the connected motor.

Read more
Optimizing Factory Automation: The Definitive Guide to VFD Preventive Maintenance

Optimizing Factory Automation: The Definitive Guide to VFD Preventive Maintenance

Variable Frequency Drives (VFDs) serve as critical assets in modern industrial automation. These power electronic devices regulate electric motors by adjusting the supplied frequency and voltage. Consequently, industries utilize VFDs to reduce energy consumption and optimize process control. Major manufacturers like Siemens, ABB, and Yaskawa design highly efficient drives. However, sustained efficiency requires a rigorous preventive maintenance program.

Read more