Skip to content

What are you looking for?


You may also like

GE FC200656-03 VIVID 7 BEP CARDGE FC200656-03 VIVID 7 BEP CARDGE FC200656-03 VIVID 7 BEP CARD
GE FC200656-03 VIVID 7 BEP CARD
GE FC200656-03 VIVID 7 BEP CARD
GE FC200656-03 VIVID 7 BEP CARD

GE FC200656-03 VIVID 7 BEP CARD


Only 10 left - Selling fast

PRODUCT SKU : FC302312-03

PRODUCT TYPE : CPU Processors

PRODUCT VENDOR : General Electric


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

The GE FC200656-03, also cataloged as the FC200656 PC2IPIIB BEP Board, operates as a dedicated hardware component for high-speed signal routing and system interface processing within GE VIVID 7 ultrasound systems.

Hardware Specifications

Parameter Specification
Model FC200656-03
Brand GE (GE Vingmed Ultrasound)
Origin USA
Operating Temp Standard industrial operating range
Power Consumption Standard backplane power input
Component Type PC2IPIIB Back-End Processor (BEP) Card
System Platform GE LOGIC 9 / VIVID 7 Systems
Subsystem Vingmed Ultrasound BEP Architecture

Backplane Bus Communication Velocity & Deterministic Network Execution

The FC200656-03 PC2IPIIB card processes image acquisition data and control signals across backplane bus communication velocity pathways within the Back-End Processor (BEP) card cage. Internal data transfer lines ensure low-latency packet routing between the primary computing unit and front-end signal channels.

Designed to meet strict firmware flash compatibility parameters across VIVID 7 revision builds, the card maintains deterministic data transfer across EtherNet/IP deterministic networks. The hardware architecture supports system-level I/O density scaling to handle high-bandwidth real-time sensor array calculations without system clock drift or processing bottlenecks.

Frequently Asked Questions

Q: What primary subsystem within the GE VIVID 7 platform utilizes the FC200656-03 board?

A: The FC200656-03 functions specifically inside the Back-End Processor (BEP) assembly as the PC2IPIIB interface card.

Q: Is live insertion or extraction supported for the FC200656-03 card during active equipment operation?

A: No. System power to the main enclosure must be completely disconnected and isolated prior to pulling or installing the card to prevent bus logic damage.

Q: What precautions should be taken regarding electrostatic discharge (ESD) during board handling?

A: Technicians must wear a grounded anti-static wrist strap connected to a bare metal chassis ground point to avoid electrostatic damage to onboard integrated circuits.

Field Installation Guidelines

  1. Power Shutdown: Turn off the main system circuit breaker and disconnect primary AC power from the equipment frame before opening the card cage.
  2. Anti-Static Discharge: Connect a grounded ESD wrist band to an unpainted metal frame point before removing the card from its anti-static shielding packaging.
  3. Card Slot Insertion: Slide the FC200656-03 card evenly along the chassis slot card guide rails until the backplane connectors align with the rear socket.
  4. Connector Engagement: Press the card firmly into the rack backplane to seat all connector pins, then tighten all front panel thumbscrews.
  5. Final Inspection: Verify that all adjacent card interfaces and retaining hardware are secured before restoring power to the system enclosure.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Redundant Automation Systems: Maximizing Uptime in Critical Control Applications

Redundant Automation Systems: Maximizing Uptime in Critical Control Applications

Industrial automation relies on continuous operational stability to prevent catastrophic downtime and financial loss. While standard dictionary definitions treat redundancy as superfluous, industrial engineers consider redundant control architectures indispensable for high-availability systems. Implementing backup hardware ensures seamless takeover during primary equipment failures, protecting critical infrastructure across manufacturing and process industries.

Read more
Demystifying the 5 Levels of Industrial Automation Architecture

Demystifying the 5 Levels of Industrial Automation Architecture

Modern manufacturing relies on structured communication hierarchy to bridge physical shop-floor hardware with enterprise management software. This framework, commonly known as the Automation Pyramid, establishes how data flows between field devices, logic controllers, and corporate IT networks. Understanding these five distinct levels helps engineers and plant managers optimize system operations, reduce downtime, and implement seamless factory automation solutions.

Read more
Transforming Shop Floor Data into Actionable Insights: A Deep Dive into MES

Transforming Shop Floor Data into Actionable Insights: A Deep Dive into MES

Manufacturing Execution Systems serve as the digital backbone of modern factory floors. Positioned at Level 3 of the ISA-95 automation pyramid, MES links enterprise resource planning with real-time shop floor control systems. Today, industrial operators rely on MES software to bridge operational strategy with physical production execution.

Read more