Skip to content

What are you looking for?


You may also like

GE DS200TCCBG1B TC2000 Extended Analog I/O BoardGE DS200TCCBG1B TC2000 Extended Analog I/O BoardGE DS200TCCBG1B TC2000 Extended Analog I/O Board
GE DS200TCCBG1B TC2000 Extended Analog I/O Board
GE DS200TCCBG1B TC2000 Extended Analog I/O Board
GE DS200TCCBG1B TC2000 Extended Analog I/O Board

GE DS200TCCBG1B TC2000 Extended Analog I/O Board


Only 10 left - Selling fast

PRODUCT SKU : DS200TCCBG1B

PRODUCT TYPE : Analog Input Output Modules

PRODUCT VENDOR : General Electric


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

Configured for analog signal processing within Mark V turbine control systems, the GE DS200TCCBG1B (DS200TCCB Analog I/O Board) provides direct physical execution of signal conversion and interface management.

Hardware Specifications

Parameter Specification
Model DS200TCCBG1B
Brand GE
Core Performance 80196 CPU, PROM modules, 50-pin I/O connectivity

PLC/DCS Industrial Control Integration

The DS200TCCBG1B integrates into the Mark V control architecture to perform analog data acquisition and signal distribution. The module utilizes an onboard 80196 CPU to manage data processing, relying on specific firmware flash compatibility to maintain synchronization with the turbine control system bus. I/O density scaling is achieved through high-density 50-pin connectors (JCC, JDD), while deterministic network performance is governed by the system's backplane bus communication velocity. Hardware settings are adjusted via physical jumpers (JP1-JP3) to align the board's electrical response with the specific requirements of the connected drive or sensor loops.

Frequently Asked Questions

Q: Are the jumpers on this board software-configurable?

A: No. The DS200TCCBG1B uses physical jumpers to configure hardware settings. Configuration changes must be performed manually by repositioning the jumpers on the designated pins.

Q: Can this module be hot-swapped while the system is powered?

A: No. The module must be de-energized before installation or removal. Hot-swapping can induce voltage spikes that may damage the onboard 80196 CPU or the PROM memory modules.

Q: What is the function of the JTEST and TCQPL connectors?

A: These connectors are reserved for manufacturer-level diagnostics and factory testing. They are typically not utilized during standard field operation or site-level configuration.

Field Installation Guidelines

  • Jumper Configuration: When adjusting jumpers JP1, JP2, or JP3, ensure the shunt is firmly seated across the intended pin pair. Do not use excessive force, as the jumper pins are susceptible to mechanical bending.
  • Connector Integrity: Inspect the 50-pin connectors (JCC and JDD) for bent pins or oxidation before mating. Ensure cables are fully latched to prevent intermittent signal loss during high-vibration operation.
  • Static Management: The board contains sensitive PROM and microprocessor components. Use a grounded wrist strap at all times when handling or configuring the module to prevent electrostatic discharge (ESD) damage.
  • Documentation Adherence: If the module replacement requires changes from default jumper positions, strictly follow the specific technical documentation provided with the hardware to ensure correct loop response.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Executing a PLC System Site Acceptance Test (SAT): The Definitive Engineering Guide

Executing a PLC System Site Acceptance Test (SAT): The Definitive Engineering Guide

The transition of a Programmable Logic Controller (PLC) cabinet from a controlled factory floor to a volatile plant environment represents a critical milestone in factory automation. While a Factory Acceptance Test (FAT) validates standalone hardware compliance under ideal conditions, it cannot replicate real-world process dynamics. Therefore, deploying an industrial automation system requires a rigorous Site Acceptance Test (SAT) to verify total loop integrity, field wiring wiring metrics, and process control parameters before final customer handover.

Read more
Advanced Integration: Master Protocol for VFD Commissioning and Testing

Advanced Integration: Master Protocol for VFD Commissioning and Testing

Deploying variable frequency drives (VFDs) requires precise execution during the initial commissioning phase. Junior automation engineers often find the first power-up sequence intimidating. However, following a rigorous engineering framework ensures equipment safety and system reliability. Proper startup procedures protect both the drive electronics and the connected motor.

Read more
Optimizing Factory Automation: The Definitive Guide to VFD Preventive Maintenance

Optimizing Factory Automation: The Definitive Guide to VFD Preventive Maintenance

Variable Frequency Drives (VFDs) serve as critical assets in modern industrial automation. These power electronic devices regulate electric motors by adjusting the supplied frequency and voltage. Consequently, industries utilize VFDs to reduce energy consumption and optimize process control. Major manufacturers like Siemens, ABB, and Yaskawa design highly efficient drives. However, sustained efficiency requires a rigorous preventive maintenance program.

Read more