Skip to content

What are you looking for?


You may also like

GE DS200SDCCG4A Drive Control BoardGE DS200SDCCG4A Drive Control BoardGE DS200SDCCG4A Drive Control Board
GE DS200SDCCG4A Drive Control Board
GE DS200SDCCG4A Drive Control Board
GE DS200SDCCG4A Drive Control Board

GE DS200SDCCG4A Drive Control Board


Only 10 left - Selling fast

PRODUCT SKU : DS200SDCCG4A

PRODUCT TYPE : Controller Boards

PRODUCT VENDOR : General Electric


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

Configured for high-speed motor and drive regulation in Mark V control systems, the GE DS200SDCCG4A (DS200SDCCG4A Controller Board) provides direct physical execution of drive control, motor control, and co-motion processing tasks.

Hardware Specifications

Parameter Specification
Model DS200SDCCG4A
Brand GE (General Electric)
Origin USA
Operating Temp Standard industrial range
Microprocessors 80C186 (DCP), 80C196 (MCP), TMS320C25 (CMP)
Memory 4 x EPROM, 1 x EEPROM

Backplane Bus Communication and Deterministic Processing

The DS200SDCCG4A utilizes three distinct 16-bit microprocessors interconnected via dual-ported RAM (DPR) to ensure deterministic communication across the Mark V backplane. The Drive Control Processor (DCP) handles system-level operations, while the Motor Control Processor (MCP) manages inner-loop current regulation. For computationally intensive tasks, the Co-motion Processor (CMP) employs a TMS320C25 digital signal processor. Firmware flash compatibility is managed through onboard EPROM sockets, with site-specific calibration parameters stored within the U9 EEPROM. Precise address decoding and DMA control are maintained to ensure stable backplane bus communication velocity during complex ac/dc motor drive sequences.

Frequently Asked Questions

Q: Are the memory chips (EPROM/EEPROM) hot-swappable during system operation?

A: No. Memory chips located in the sockets must be replaced only while the card is powered down. Hot-swapping these components while the drive is active will cause immediate control failure and potential corruption of configuration data.

Q: How is the CMP processor utilized within the SDCC architecture?

A: The CMP (U35) is enabled only for motor control algorithms requiring processing power exceeding the capabilities of the MCP. It interfaces exclusively with its dedicated dual-ported RAM and EPROM to maintain high-speed execution of math-intensive control loops.

Field Installation Guidelines

  1. Ensure the control system is fully de-energized before inserting or removing the DS200SDCCG4A card from the Mark V cabinet rack.
  2. Verify that all jumper settings on the replacement board match the original configuration before installation to prevent conflicts in I/O scaling.
  3. Handle the board by the edges or the faceplate to avoid electrostatic discharge (ESD) damage to the microprocessors and memory chips.
  4. After installation, confirm that the EEPROM (U9) contains the correct site-specific parameters, as the new board will not be pre-configured with the specific tuning constants of the drive it is replacing.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Executing a PLC System Site Acceptance Test (SAT): The Definitive Engineering Guide

Executing a PLC System Site Acceptance Test (SAT): The Definitive Engineering Guide

The transition of a Programmable Logic Controller (PLC) cabinet from a controlled factory floor to a volatile plant environment represents a critical milestone in factory automation. While a Factory Acceptance Test (FAT) validates standalone hardware compliance under ideal conditions, it cannot replicate real-world process dynamics. Therefore, deploying an industrial automation system requires a rigorous Site Acceptance Test (SAT) to verify total loop integrity, field wiring wiring metrics, and process control parameters before final customer handover.

Read more
Advanced Integration: Master Protocol for VFD Commissioning and Testing

Advanced Integration: Master Protocol for VFD Commissioning and Testing

Deploying variable frequency drives (VFDs) requires precise execution during the initial commissioning phase. Junior automation engineers often find the first power-up sequence intimidating. However, following a rigorous engineering framework ensures equipment safety and system reliability. Proper startup procedures protect both the drive electronics and the connected motor.

Read more
Optimizing Factory Automation: The Definitive Guide to VFD Preventive Maintenance

Optimizing Factory Automation: The Definitive Guide to VFD Preventive Maintenance

Variable Frequency Drives (VFDs) serve as critical assets in modern industrial automation. These power electronic devices regulate electric motors by adjusting the supplied frequency and voltage. Consequently, industries utilize VFDs to reduce energy consumption and optimize process control. Major manufacturers like Siemens, ABB, and Yaskawa design highly efficient drives. However, sustained efficiency requires a rigorous preventive maintenance program.

Read more