Skip to content

What are you looking for?


You may also like

GE DS200LPPAG1A Line Protection CardGE DS200LPPAG1A Line Protection CardGE DS200LPPAG1A Line Protection Card
GE DS200LPPAG1A Line Protection Card
GE DS200LPPAG1A Line Protection Card
GE DS200LPPAG1A Line Protection Card

GE DS200LPPAG1A Line Protection Card


Only 10 left - Selling fast

PRODUCT SKU : DS200LPPAG1A

PRODUCT TYPE : Line Protection Cards

PRODUCT VENDOR : General Electric


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

Configured for power line monitoring and fault isolation in EX2000 excitation control systems, the GE DS200LPPAG1A (DS200LPPA Line Protection Card) provides direct physical execution of transmission line analysis and abnormal condition detection.

Hardware Specifications

Parameter Specification
Model DS200LPPAG1A
Brand General Electric
Origin USA
Weight 2 lbs
Operating Temp 0 deg C to +65 deg C
Power Consumption +18 VDC to +32 VDC
Interfaces 2 terminal blocks (3 terminals each), 7 jumpers (JP1-JP7)

Industrial Control and Firmware Flash Compatibility

The DS200LPPAG1A is integrated into the EX2000 system to monitor transmission line parameters, including voltage stability, overcurrent, and short-circuit conditions. Deterministic fault detection is achieved through continuous analog signal monitoring. When abnormal conditions such as line-to-ground faults or overloads are identified, the card triggers an isolation sequence, sending signals to disconnect the affected line to protect the generator and associated turbine equipment. The module supports firmware flash compatibility through the QNX Neutrino operating system environment, ensuring the protection logic remains aligned with system control requirements. I/O density scaling and fault-detection sensitivity are calibrated using seven onboard jumpers (JP1-JP7), which define the protection parameters and isolation behavior.

Frequently Asked Questions

Q: Can the JP1 through JP7 jumpers be adjusted during turbine operation?

A: No. Any changes to jumper configurations to alter protection thresholds or isolation behavior must be performed while the system is de-energized and the turbine is offline to prevent unexpected signal states or system trips.

Q: How does the DS200LPPAG1A interface with the QNX Neutrino operating system?

A: The card provides digitized fault status signals that are interpreted by the QNX Neutrino-based control platform. This allows for real-time monitoring and logging of line faults detected by the hardware.

Field Installation Guidelines

  1. Ensure the EX2000 control cabinet is de-energized and all power sources are isolated before installing or removing the module to avoid electrical shock.
  2. Verify that the input power supply is within the +18 VDC to +32 VDC range before initiating system startup.
  3. Terminate signal wires into the two onboard 3-terminal blocks, ensuring connections are tightened to industrial torque standards to prevent high-resistance contact faults.
  4. Perform a dry-run diagnostic test after installation to ensure the protection card correctly communicates fault status signals to the control platform before placing the turbine into operation.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Executing a PLC System Site Acceptance Test (SAT): The Definitive Engineering Guide

Executing a PLC System Site Acceptance Test (SAT): The Definitive Engineering Guide

The transition of a Programmable Logic Controller (PLC) cabinet from a controlled factory floor to a volatile plant environment represents a critical milestone in factory automation. While a Factory Acceptance Test (FAT) validates standalone hardware compliance under ideal conditions, it cannot replicate real-world process dynamics. Therefore, deploying an industrial automation system requires a rigorous Site Acceptance Test (SAT) to verify total loop integrity, field wiring wiring metrics, and process control parameters before final customer handover.

Read more
Advanced Integration: Master Protocol for VFD Commissioning and Testing

Advanced Integration: Master Protocol for VFD Commissioning and Testing

Deploying variable frequency drives (VFDs) requires precise execution during the initial commissioning phase. Junior automation engineers often find the first power-up sequence intimidating. However, following a rigorous engineering framework ensures equipment safety and system reliability. Proper startup procedures protect both the drive electronics and the connected motor.

Read more
Optimizing Factory Automation: The Definitive Guide to VFD Preventive Maintenance

Optimizing Factory Automation: The Definitive Guide to VFD Preventive Maintenance

Variable Frequency Drives (VFDs) serve as critical assets in modern industrial automation. These power electronic devices regulate electric motors by adjusting the supplied frequency and voltage. Consequently, industries utilize VFDs to reduce energy consumption and optimize process control. Major manufacturers like Siemens, ABB, and Yaskawa design highly efficient drives. However, sustained efficiency requires a rigorous preventive maintenance program.

Read more