Skip to content

What are you looking for?


You may also like

DS200TCTGG1A | GE | Turbine Trip BoardDS200TCTGG1A | GE | Turbine Trip BoardDS200TCTGG1A | GE | Turbine Trip Board
DS200TCTGG1A | GE | Turbine Trip Board
DS200TCTGG1A | GE | Turbine Trip Board
DS200TCTGG1A | GE | Turbine Trip Board

DS200TCTGG1A | GE | Turbine Trip Board


Only 10 left - Selling fast

PRODUCT SKU : DS200TCTGG1A

PRODUCT TYPE : Turbine Trip Boards

PRODUCT VENDOR : General Electric


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

Configured for emergency shutdown and trip logic execution in Mark V turbine control systems, the GE DS200TCTGG1A (DS200TCTG Turbine Trip Board) provides direct physical execution of turbine trip sequences and breaker control.

Hardware Specifications

Parameter Specification
Model DS200TCTGG1A
Brand General Electric
Origin USA
Operating Temp Standard industrial range
Power Consumption Not specified
Relays 21 x Electromechanical plug-in relays
Connectors 3 x 50-pin (JLX, JLY, JLZ), 2 x 12-pin (JN, JM)

Industrial Control and Firmware Flash Compatibility

The DS200TCTGG1A utilizes a Simplex software architecture to manage high-speed trip operations. Deterministic network performance is maintained through fixed relay logic and integrated circuit pathways. Firmware flash compatibility is not applicable to this board, as logic execution is hardware-defined via the TCTG ETR/PTR relay circuits and generator breaker close circuits. The module supports deterministic networks by facilitating manual and external trip signal processing, ensuring minimal latency between trip initiation and relay actuation. The board incorporates normal-style conformal coating to protect integrated circuits from atmospheric contamination in standard industrial environments.

Frequently Asked Questions

Q: Are the 21 electromechanical relays field-replaceable?

A: While the relays are plug-in type, they are highly sensitive to mechanical shock and electrostatic discharge. Replacement should only be performed in a controlled environment using original-specification components to ensure trip timing integrity.

Q: Can this board be used to replace the base DS200TCTG board without adjustment?

A: The G1A revision includes functionality-enhancing modifications. Ensure the control system software and associated terminal board configurations are compatible with the G1A revision before installation, as incorrect revision matching may cause trip sequence logic mismatches.

Field Installation Guidelines

  1. Discharge static electricity from the body and tools prior to handling the board to prevent catastrophic damage to the electromechanical relays and integrated circuits.
  2. Verify that all 50-pin (JLX, JLY, JLZ) and 12-pin (JN, JM) connectors are fully seated and free of oxidation to ensure reliable trip signal transmission.
  3. Handle the board exclusively by its edges or faceplate to avoid applying stress to the fragile relay assemblies.
  4. Perform a functional trip test post-installation to confirm that the ETR and PTR relay circuits respond within the defined timing parameters of the Speedtronic control system.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Executing a PLC System Site Acceptance Test (SAT): The Definitive Engineering Guide

Executing a PLC System Site Acceptance Test (SAT): The Definitive Engineering Guide

The transition of a Programmable Logic Controller (PLC) cabinet from a controlled factory floor to a volatile plant environment represents a critical milestone in factory automation. While a Factory Acceptance Test (FAT) validates standalone hardware compliance under ideal conditions, it cannot replicate real-world process dynamics. Therefore, deploying an industrial automation system requires a rigorous Site Acceptance Test (SAT) to verify total loop integrity, field wiring wiring metrics, and process control parameters before final customer handover.

Read more
Advanced Integration: Master Protocol for VFD Commissioning and Testing

Advanced Integration: Master Protocol for VFD Commissioning and Testing

Deploying variable frequency drives (VFDs) requires precise execution during the initial commissioning phase. Junior automation engineers often find the first power-up sequence intimidating. However, following a rigorous engineering framework ensures equipment safety and system reliability. Proper startup procedures protect both the drive electronics and the connected motor.

Read more
Optimizing Factory Automation: The Definitive Guide to VFD Preventive Maintenance

Optimizing Factory Automation: The Definitive Guide to VFD Preventive Maintenance

Variable Frequency Drives (VFDs) serve as critical assets in modern industrial automation. These power electronic devices regulate electric motors by adjusting the supplied frequency and voltage. Consequently, industries utilize VFDs to reduce energy consumption and optimize process control. Major manufacturers like Siemens, ABB, and Yaskawa design highly efficient drives. However, sustained efficiency requires a rigorous preventive maintenance program.

Read more