PRODUCT SKU : DS200TBQBG1A

PRODUCT TYPE : Input Termination Modules

PRODUCT VENDOR : General Electric


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

Configured for signal termination and routing in Mark V turbine control systems, the GE DS200TBQBG1A (DS200TBQB Input Termination Module) provides direct physical execution of voltage, vibration, and pulse rate signal acquisition.

Hardware Specifications

Parameter Specification
Model DS200TBQBG1A
Brand General Electric
Origin USA
Operating Temp Standard industrial range
Signal Inputs Voltage, vibration, pulse rate

Industrial Control and Firmware Flash Compatibility

The DS200TBQBG1A serves as the primary interface for field sensors within the R2 and R3 control cores. The module maintains deterministic network integrity by linking directly to the TCQA and TCQC processing boards. Firmware flash compatibility is not applicable to this passive termination assembly, as operational data transfer is governed by hardwired signal paths from the field terminals to the core interface connectors. Backplane bus communication velocity is optimized through dedicated coupling paths, ensuring low-latency processing of pulse rate and vibration data. This configuration supports high-density I/O integration, allowing the TBQB board to act as a centralized termination point for varied instrumentation types.

Frequently Asked Questions

Q: Does the TBQB module require external software configuration?

A: No. The DS200TBQBG1A is a hardware-based termination module without onboard software or firmware. Signal routing is defined by physical cabling to the TCQA and TCQC interface boards.

Q: Are the vibration signal paths shielded on this board?

A: Vibration signals are highly susceptible to noise. The board is designed to interface with the system's ground plane; ensure that incoming vibration sensor shields are securely terminated at the cabinet earth bus to maintain signal fidelity.

Field Installation Guidelines

  1. Ensure the control rack is de-energized before mounting the module to prevent electrical transients from entering the sensitive pulse and vibration acquisition circuits.
  2. Verify all field wiring connections for voltage and vibration sensors; maintain proper segregation between signal-level wiring and high-voltage power lines to prevent electromagnetic interference.
  3. Secure the module in the seventh position of the R2 or R3 core as specified by the system design documentation.
  4. Confirm that all ribbon cable connections to the TCQA and TCQC boards are fully seated and free of oxidation to ensure reliable data transmission to the processing cores.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Executing a PLC System Site Acceptance Test (SAT): The Definitive Engineering Guide

Executing a PLC System Site Acceptance Test (SAT): The Definitive Engineering Guide

The transition of a Programmable Logic Controller (PLC) cabinet from a controlled factory floor to a volatile plant environment represents a critical milestone in factory automation. While a Factory Acceptance Test (FAT) validates standalone hardware compliance under ideal conditions, it cannot replicate real-world process dynamics. Therefore, deploying an industrial automation system requires a rigorous Site Acceptance Test (SAT) to verify total loop integrity, field wiring wiring metrics, and process control parameters before final customer handover.

Read more
Advanced Integration: Master Protocol for VFD Commissioning and Testing

Advanced Integration: Master Protocol for VFD Commissioning and Testing

Deploying variable frequency drives (VFDs) requires precise execution during the initial commissioning phase. Junior automation engineers often find the first power-up sequence intimidating. However, following a rigorous engineering framework ensures equipment safety and system reliability. Proper startup procedures protect both the drive electronics and the connected motor.

Read more
Optimizing Factory Automation: The Definitive Guide to VFD Preventive Maintenance

Optimizing Factory Automation: The Definitive Guide to VFD Preventive Maintenance

Variable Frequency Drives (VFDs) serve as critical assets in modern industrial automation. These power electronic devices regulate electric motors by adjusting the supplied frequency and voltage. Consequently, industries utilize VFDs to reduce energy consumption and optimize process control. Major manufacturers like Siemens, ABB, and Yaskawa design highly efficient drives. However, sustained efficiency requires a rigorous preventive maintenance program.

Read more