Skip to content

What are you looking for?


You may also like

Emerson 396571-02-6 ControlWave Isolated Input ModuleEmerson 396571-02-6 ControlWave Isolated Input ModuleEmerson 396571-02-6 ControlWave Isolated Input Module
Emerson 396571-02-6 ControlWave Isolated Input Module
Emerson 396571-02-6 ControlWave Isolated Input Module
Emerson 396571-02-6 ControlWave Isolated Input Module

Emerson 396571-02-6 ControlWave Isolated Input Module


Only 10 left - Selling fast

PRODUCT SKU : 396571-02-6

PRODUCT TYPE : Discrete Input Modules

PRODUCT VENDOR : EMERSON


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

The Emerson 396571-02-6, also cataloged as the 396571 Isolated Input Module, operates as a dedicated hardware component for galvanic signal conditioning and field contact state detection within ControlWave PLC platforms. Equipped with a 24 V local connector and an integrated LED daughterboard, it processes field input signals while maintaining electrical isolation from internal backplane logic.

Hardware Specifications

Parameter Specification
Model 396571-02-6
Brand Emerson
Base Model 396571
Origin USA
Weight 0.26 lbs (approx. 0.12 kg)
Dimensions Standard ControlWave Micro Module Footprint
Operating Temp -40 to 70 deg C
Power Consumption 24 VDC Local Connector Powered
Signal Isolation Isolated Field Circuits
Local Indication Onboard LED Daughterboard
System Compatibility ControlWave PLC Series

4-20 mA HART Loop Protocol and Channel Isolation

The 396571-02-6 module incorporates optical channel-to-channel isolation architecture to decouple field-side transients from the internal system bus. This isolation structure suppresses common-mode voltage spikes, ground loops, and electrical cross-talk, preventing signal degradation across neighboring analog circuits running 4-20 mA HART loop protocol signals on the same backplane assembly.

Frequently Asked Questions

Q: What function does the integrated LED daughterboard serve on the 396571-02-6 module?

A: The onboard LED daughterboard provides real-time local visual status indication for channel input state activity and diagnostic hardware conditions.

Q: How is local power supplied to the input circuitry of the 396571-02-6?

A: The module utilizes a dedicated 24 V local connector interface to deliver isolated operating voltage directly to field input sensing circuits.

Q: Can the 396571-02-6 module be hot-swapped during system operation?

A: Hot-swapping limits depend on the specific ControlWave rack chassis configuration; field power to the 24 V local connector should be isolated prior to module removal to avoid arc discharge.

Field Installation Guidelines

  1. Power down field-side 24 V power connections before seating or unseating the module from the ControlWave backplane chassis.
  2. Align the module circuit board with the chassis guide rails and push firmly until the backplane connector engages completely.
  3. Tighten the retaining panel fasteners to establish frame grounding contact and secure the assembly against vibration.
  4. Wire 24 V local input power and field signal leads to the designated terminal header, ensuring proper polarity.
  5. Ground field cable shielding at a single grounding point on the enclosure chassis to minimize electromagnetic noise coupling.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Marshalling Cabinet Preventive Maintenance: Essential Healthiness Checks for PLC, DCS, and ESD Systems

Marshalling Cabinet Preventive Maintenance: Essential Healthiness Checks for PLC, DCS, and ESD Systems

Marshalling cabinets serve as the vital interface between field instrumentation and control room electronics in modern process facilities. Regular preventive maintenance of these cabinets ensures signal integrity across programmable logic controllers (PLCs), distributed control systems (DCS), and emergency shutdown (ESD) networks. System technicians must execute structured inspection protocols to mitigate environmental risks, identify loose wiring, and maintain continuous operational readiness.

Read more
Spatial Computing in Industrial Automation: Elevating PLC and DCS Operations with AR and VR

Spatial Computing in Industrial Automation: Elevating PLC and DCS Operations with AR and VR

Industry 4.0 integrates digital intelligence into field operations, transforming factory automation landscapes worldwide. Spatial technologies—specifically Augmented Reality (AR) and Virtual Reality (VR)—redefine how engineers interact with industrial control systems. By bridging computer-generated CAD models with real-time operational technology (OT) data, immersive displays enable intuitive monitoring, rapid diagnostics, and safer maintenance across complex processing facilities.

Read more
Master Acceptance Testing: Understanding FAT and SAT in Industrial Control Systems

Master Acceptance Testing: Understanding FAT and SAT in Industrial Control Systems

Factory Acceptance Testing (FAT) and Site Acceptance Testing (SAT) serve as critical quality assurance gateways in complex industrial control systems. Both procedures verify that programmable logic controllers (PLCs), distributed control systems (DCS), and associated field devices meet strict functional specifications. However, executing these tests effectively requires clear delineation between off-site staging and final field commissioning.

Read more