Skip to content

What are you looking for?


You may also like

Honeywell GN-KRR011 51204147-001 Fiber Optic CableHoneywell GN-KRR011 51204147-001 Fiber Optic CableHoneywell GN-KRR011 51204147-001 Fiber Optic Cable
Honeywell GN-KRR011 51204147-001 Fiber Optic Cable
Honeywell GN-KRR011 51204147-001 Fiber Optic Cable
Honeywell GN-KRR011 51204147-001 Fiber Optic Cable

Honeywell GN-KRR011 51204147-001 Fiber Optic Cable


Only 10 left - Selling fast

PRODUCT SKU : GN-KRR011 51204147-001

PRODUCT TYPE : Fiber Optic Cables

PRODUCT VENDOR : Honeywell


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

Configured for high-speed deterministic signal transmission in industrial automation systems, the Honeywell GN-KRR011 51204147-001 (GN-KRR011 Fiber Optic Cable) provides direct physical/electrical execution. The hardware component establishes an optical interface link between station bus participants, zone controllers, or network components, allowing uncorrupted voice, data, and I/O tracking signals to route seamlessly into the C300 controller topology.

Hardware Specifications

Parameter Specification
Model GN-KRR011 51204147-001
Brand Honeywell
Series / Module Type Series 8 / C300 Redundancy Network Component
Origin USA
Weight 0.2 kg
Dimensions 2 meters (Total assembly length)
Operating Temp -40 to +70 deg C
Power Supply 24 VDC system standard reference voltage
Cable Type Simplex, multimode HCS fiber optic
Connectors LC connector (End A), ST connector (End B)
Jacket Material PVC insulation and jacket
Data Capabilities Synchronous voice, data, and IO Link data streams
System Compatibility Honeywell C300 Controllers, IO Link, ISA100 network modules

4-20 mA HART Loop Protocol and Channel-to-Channel Isolation

The GN-KRR011 51204147-001 multimode HCS fiber optic assembly delivers total electrical channel-to-channel isolation between synchronized C300 controllers or remote IO Link interfaces. By replacing copper wire with an optical link, it completely suppresses cross-talk, common-mode voltage spikes, and ground loops that degrade analog input loops. This configuration supports high-frequency digital traffic alongside traditional 4-20 mA HART loop protocol parameters, ensuring that distributed field instruments communicate accurate process values to the centralized DCS architecture without signal loss.

Frequently Asked Questions

Q: How does this optical cable maintain structural protection against ground differentials between controllers located in separate electrical rooms?

A: Because the multimode fiber architecture relies entirely on light wave propagation, there is no metallic contact. This provides absolute channel-to-channel isolation, completely neutralizing voltage offsets and preventing dangerous fault currents from running along the system bus.

Q: Can the cable bend radius be altered during high-density tray routing?

A: The cable uses a durable HCS fiber base with a PVC jacket, but the minimum dynamic bend radius specified by the manufacturer must be maintained. Tight bends will cause macro-bending loss, which attenuates the light signal and degrades data frame integrity across the IO Link.

Field Installation Guidelines

  1. Routing and Physical Path Separation: Lay the fiber optic assembly inside dedicated low-voltage wire ways. Keep it away from high-voltage AC cables to prevent mechanical crushing or tearing from heavy physical lines.
  2. Connector Connection Sequence: Remove the protective dust caps immediately before mating the interfaces. Insert the LC connector end into the C300 IOTA or network transceiver port until it clicks securely, then turn and lock the ST connector end onto its matching node.
  3. Pulling Force Limits: Never apply axial pulling force directly to the LC or ST connector boots during installation. Pull gently on the external PVC cable jacket to prevent cracking the inner glass-core junction.
  4. Thermal Monitoring: Ensure the cable run stays within the specified -40 to +70 deg C thermal limit. Do not place the cable against steam pipes, high-output heat sinks, or unventilated surfaces inside the cabinet.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
FAT vs SAT in Industrial Control Systems: Key Differences and Execution Guide

FAT vs SAT in Industrial Control Systems: Key Differences and Execution Guide

Industrial control system deployment relies on strict verification protocols to guarantee operational safety, system stability, and regulatory compliance. Commissioning complex Programmable Logic Controller (PLC) racks, Distributed Control Systems (DCS), and Safety Instrumented Systems (SIS) requires two critical milestones: the Factory Acceptance Test (FAT) and the Site Acceptance Test (SAT). Both procedures validate that system automation meets design specifications, but they occur at different stages of project execution and target distinct operational risks.

Read more
Hub vs Switch vs Router in Industrial Automation Architecture

Hub vs Switch vs Router in Industrial Automation Architecture

Modern factory automation relies on reliable industrial networking infrastructure to exchange real-time field data across operational technology systems. Engineers often encounter networking hardware like hubs, switches, and routers when integrating Programmable Logic Controllers, Distributed Control Systems, and SCADA monitoring nodes. Although these devices share physical ports, they operate at different layers of the Open Systems Interconnection reference model and deliver distinct traffic management capabilities.

Read more
Marshalling Cabinet Preventive Maintenance: Essential Healthiness Checks for PLC, DCS, and ESD Systems

Marshalling Cabinet Preventive Maintenance: Essential Healthiness Checks for PLC, DCS, and ESD Systems

Marshalling cabinets serve as the vital interface between field instrumentation and control room electronics in modern process facilities. Regular preventive maintenance of these cabinets ensures signal integrity across programmable logic controllers (PLCs), distributed control systems (DCS), and emergency shutdown (ESD) networks. System technicians must execute structured inspection protocols to mitigate environmental risks, identify loose wiring, and maintain continuous operational readiness.

Read more