Skip to content

What are you looking for?


You may also like

General Electric IS230PCAAH1A Core Analog Module | Mark VIeGeneral Electric IS230PCAAH1A Core Analog Module | Mark VIeGeneral Electric IS230PCAAH1A Core Analog Module | Mark VIe
General Electric IS230PCAAH1A Core Analog Module | Mark VIe
General Electric IS230PCAAH1A Core Analog Module | Mark VIe
General Electric IS230PCAAH1A Core Analog Module | Mark VIe

General Electric IS230PCAAH1A Core Analog Module | Mark VIe


Only 10 left - Selling fast

PRODUCT SKU : IS230PCAAH1A

PRODUCT TYPE : Analog Input Modules

PRODUCT VENDOR : General Electric


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

Configured for high-density signal acquisition and control in Mark VIe gas turbine platforms, the GE IS230PCAAH1A (IS230PCAAH1A Core Analog Module) provides direct physical/electrical execution. This module handles a comprehensive array of I/O types, including thermocouple inputs, 4-20 mA current loops, seismic vibration monitoring, LVDT excitation, pulse rate inputs, and servo coil outputs.

Hardware Specifications

Parameter Specification
Model IS230PCAAH1A
Brand General Electric
Origin USA
Weight Not specified
Dimensions 17.71 cm x 13.77 cm x 7.87 cm
Operating Temp -30 to 65 deg C
Power Consumption 28 VDC nominal

Profinet / EtherNet/IP Deterministic Networks

The IS230PCAAH1A module relies on precise backplane bus communication velocity to maintain deterministic control loops across simplex, dual, and TMR architectures. System performance is tied to firmware flash compatibility between the PCAA module and the host controller, ensuring synchronized data exchange over the dual RJ45 Ethernet ports. I/O density scaling is achieved through modular integration with the TCAT terminal board; when operating in TMR modes, signal fan-out must be managed via the TCAT to ensure data consistency across redundant PCAA modules. Users must adhere to defined timing constraints to prevent bus congestion during high-frequency LVDT and servo feedback polling.

Frequently Asked Questions

Q: Is the IS230PCAAH1A field-repairable at the component level?

A: No. The PCAA module is considered a single least replaceable unit (LRU). Internal board-level diagnosis or repair is not supported; faulty units must be replaced as an entire assembly.

Q: Can the PCAA module operate without the TCAT terminal board?

A: Yes. The PCAA module can function independently for dedicated I/O tasks. However, TCAT is required if fanned signal inputs are necessary for dual or TMR redundant configurations.

Field Installation Guidelines

  • Interface Connections: Connect the PCAA module to the TCAT terminal board using the two provided 68-pin cables (connectors P1 and P2). Verify that these cables are fully seated and secured to prevent intermittent signal integrity issues.
  • Power and Network: Provide 28 VDC power to the module's dedicated connector and establish network connectivity via the dual RJ45 Ethernet ports. Ensure auxiliary 24 V field power and shield grounding are supplemented by the adjacent JGPA board as required.
  • Wiring Termination: Field device I/O should be landed on the 120 Euro-style box terminals located on the module edge. Ensure proper wire stripping and torque application to prevent terminal oxidation or loosening due to turbine vibration.
  • Grounding: Ensure the module chassis is bonded to the control cabinet ground bus to provide a low-impedance reference for analog signals. Route sensitive signal wiring (thermocouples, LVDT) through shielded conduit, separated from high-current AC power cables to prevent electromagnetic crosstalk.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
FAT vs SAT in Industrial Control Systems: Key Differences and Execution Guide

FAT vs SAT in Industrial Control Systems: Key Differences and Execution Guide

Industrial control system deployment relies on strict verification protocols to guarantee operational safety, system stability, and regulatory compliance. Commissioning complex Programmable Logic Controller (PLC) racks, Distributed Control Systems (DCS), and Safety Instrumented Systems (SIS) requires two critical milestones: the Factory Acceptance Test (FAT) and the Site Acceptance Test (SAT). Both procedures validate that system automation meets design specifications, but they occur at different stages of project execution and target distinct operational risks.

Read more
Hub vs Switch vs Router in Industrial Automation Architecture

Hub vs Switch vs Router in Industrial Automation Architecture

Modern factory automation relies on reliable industrial networking infrastructure to exchange real-time field data across operational technology systems. Engineers often encounter networking hardware like hubs, switches, and routers when integrating Programmable Logic Controllers, Distributed Control Systems, and SCADA monitoring nodes. Although these devices share physical ports, they operate at different layers of the Open Systems Interconnection reference model and deliver distinct traffic management capabilities.

Read more
Marshalling Cabinet Preventive Maintenance: Essential Healthiness Checks for PLC, DCS, and ESD Systems

Marshalling Cabinet Preventive Maintenance: Essential Healthiness Checks for PLC, DCS, and ESD Systems

Marshalling cabinets serve as the vital interface between field instrumentation and control room electronics in modern process facilities. Regular preventive maintenance of these cabinets ensures signal integrity across programmable logic controllers (PLCs), distributed control systems (DCS), and emergency shutdown (ESD) networks. System technicians must execute structured inspection protocols to mitigate environmental risks, identify loose wiring, and maintain continuous operational readiness.

Read more