Skip to content

What are you looking for?


You may also like

Bently Nevada TK-3G 177314-02 Air-Driven Test KitBently Nevada TK-3G 177314-02 Air-Driven Test KitBently Nevada TK-3G 177314-02 Air-Driven Test Kit
Bently Nevada TK-3G 177314-02 Air-Driven Test Kit
Bently Nevada TK-3G 177314-02 Air-Driven Test Kit
Bently Nevada TK-3G 177314-02 Air-Driven Test Kit

Bently Nevada TK-3G 177314-02 Air-Driven Test Kit


Only 10 left - Selling fast

PRODUCT SKU : TK-3G 177314-02

PRODUCT TYPE : Air-Driven Test Kit

PRODUCT VENDOR : Bently Nevada


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

Description

The Bently Nevada TK-3G 177314-02 Air-Driven Test Kit is designed for verifying vibration and position sensors, ensuring machinery operates at peak performance with reliable accuracy.

Specifications

  • Model Number: TK-3G 177314-02

  • Type: Air-Driven Test Kit

  • Manufacturer: Bently Nevada

  • Power Requirements: 90 psi (6.2 bar) maximum

  • Maximum Speed: 0 to 5000 cpm ±1000 cpm

  • Ingress Protection: IP54 (dust and water-resistant when closed)

  • Humidity Resistance: 95% non-condensing

  • Storage Temperature Range: -18°C to 65°C (0°F to 150°F)

  • Operational Temperature Range: 0°C to 54°C (32°F to 130°F)

  • Dimensions: 19.5 cm x 29.9 cm x 24.8 cm

  • Weight: 5.22 kg

Features

  • Precision Testing: Ensures accurate calibration of vibration and position sensors.

  • Durability: IP54 protection and high humidity resistance for reliable field use.

  • Versatility: Wide operational speed range up to 5000 cpm.

  • Portability: Compact dimensions and manageable weight for easy transport.

  • Temperature Resilience: Designed for both storage and operational stability across varied environments.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Why 24V DC Is the Universal Standard for Industrial Automation Power Supplies

Why 24V DC Is the Universal Standard for Industrial Automation Power Supplies

Industrial manufacturing requires continuous uptime to prevent equipment damage. Unlike AC power, 24V DC circuits seamlessly integrate with UPS units and battery banks. During main grid failures, a 24V DC backup system instantly maintains PLC memory, instrument loops, and critical safety valves without interruption.

Read more
Site Acceptance Testing (SAT) for PLC Control Systems: An Engineering Execution Guide

Site Acceptance Testing (SAT) for PLC Control Systems: An Engineering Execution Guide

The Site Acceptance Test (SAT) represents the definitive handover stage in industrial automation projects. While the Factory Acceptance Test confirms cabinet hardware assembly off-site, the SAT validates real-world performance under live site conditions. Consequently, a structured execution strategy prevents equipment damage and guarantees seamless integration into plant operations.

Read more
Mastering the Factory Acceptance Test (FAT) for PLC Control Panels: An Expert Guide

Mastering the Factory Acceptance Test (FAT) for PLC Control Panels: An Expert Guide

The Factory Acceptance Test (FAT) is a vital milestone in industrial automation that ensures custom PLC panels meet exact design specifications before dispatch. This guide outlines the step-by-step FAT procedure and key industry best practices to prevent costly site delays and ensure long-term operational success.

Read more