Skip to content

What are you looking for?


You may also like

ABB 87TS01E GJR2360200R2000E Reliable Coupling ModuleABB 87TS01E GJR2360200R2000E Reliable Coupling ModuleABB 87TS01E GJR2360200R2000E Reliable Coupling Module
ABB 87TS01E GJR2360200R2000E Reliable Coupling Module
ABB 87TS01E GJR2360200R2000E Reliable Coupling Module
ABB 87TS01E GJR2360200R2000E Reliable Coupling Module

ABB 87TS01E GJR2360200R2000E Reliable Coupling Module


Only 10 left - Selling fast

PRODUCT SKU : 87TS01E GJR2360200R2000E

PRODUCT TYPE : Coupling Module

PRODUCT VENDOR : ABB


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

Description

The ABB 87TS01E GJR2360200R2000E is a reliable coupling module designed for industrial automation and distributed control systems. It ensures stable communication and seamless integration within ABB’s Advant Master DCS environment.

Specifications

  • Manufacturer: ABB

  • Model: 87TS01E GJR2360200R2000E

  • Product Type: Coupling Module

  • Origin: Sweden

  • Dimensions: 13.2 cm × 5.3 cm × 6.5 cm

  • Weight: 0.75 kg

  • Interface: RS‑232C serial communication

  • Function: Transfers instructions and data between computers and control systems

  • Condition: New, factory tested before shipping

  • Warranty: 12 months

Features

  • Reliable communication: Provides stable data transfer between controllers and automation systems

  • RS‑232C support: Ensures compatibility with standard serial communication protocols

  • Compact design: Saves space in control panels while maintaining robust functionality

  • Durable construction: Built for long‑term use in demanding industrial environments

  • Flexible integration: Compatible with ABB Advant Master DCS systems

  • Enhanced safety: Supports secure and efficient industrial processes

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
PLC vs. HMI: Distinguishing the Brain from the Interface in Industrial Automation

PLC vs. HMI: Distinguishing the Brain from the Interface in Industrial Automation

In the realm of industrial automation, distinguishing between a Programmable Logic Controller (PLC) and a Human-Machine Interface (HMI) is fundamental. While both devices work in tandem, they serve distinct purposes. The PLC acts as the "brain" of the operation, executing logic, whereas the HMI serves as the "eyes," allowing operators to monitor and interact with the system. Understanding this synergy is essential for any professional designing robust factory automation solutions.

Read more
Selecting the Right Industrial Automation Solution for Modern Manufacturing

Selecting the Right Industrial Automation Solution for Modern Manufacturing

Choosing an effective industrial automation system starts with a thorough process audit. You must identify tasks that are repetitive, labor-intensive, or prone to human error. Not every process requires high-level automation; therefore, prioritize operations that directly impact throughput and quality. By scoping your needs accurately, you avoid over-investing in unnecessary technology. A balanced approach ensures that your capital expenditure aligns with measurable gains in operational efficiency.

Read more
Implementing FIFO and LIFO Data Sequencing in PLC Programming

Implementing FIFO and LIFO Data Sequencing in PLC Programming

Data management serves as a cornerstone of modern industrial automation. Whether tracking materials on a conveyor or managing batch sequences in a process, engineers frequently rely on sequential logic. Two primary structures—First-In-First-Out (FIFO) and Last-In-First-Out (LIFO)—form the bedrock of this data handling. Mastering these blocks allows programmers to optimize complex machine operations efficiently.

Read more