Skip to content

What are you looking for?


You may also like

ABB 1MRK002812-AC Line Distance Protection REL670ABB 1MRK002812-AC Line Distance Protection REL670ABB 1MRK002812-AC Line Distance Protection REL670
ABB 1MRK002812-AC Line Distance Protection REL670
ABB 1MRK002812-AC Line Distance Protection REL670
ABB 1MRK002812-AC Line Distance Protection REL670

ABB 1MRK002812-AC Line Distance Protection REL670


Only 10 left - Selling fast

PRODUCT SKU : REL670 1MRK002812-AC

PRODUCT TYPE : Line Distance Protection Terminals

PRODUCT VENDOR : ABB


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

The ABB 1MRK002812-AC, also cataloged as the REL670 Line Distance Protection terminal, operates as a dedicated hardware component for localized control logic execution within substation power transmission systems. Configured for high-speed impedance measurement and selective distance fault isolation across high-voltage transmission networks, this assembly processes phase voltage and current signals to provide direct physical/electrical execution of breakers and trip commands.

Hardware Specifications

Parameter Specification
Model REL670 Ver. 1.2 (1MRK002812-AC)
Brand ABB
Origin Sweden
Weight Standard sub-rack protection assembly baseline weight (approx. 5.5 kg)
Dimensions Standard 19-inch rack-mounted casing format
Operating Temp -25 to +55 deg C (Nominal industrial execution range)
Power Consumption Substation battery bank auxiliary powered (24-250 VDC nominal range)
Product Type Line Distance Protection Terminals

Profinet / EtherNet/IP Deterministic Networks and Firmware Flash Compatibility

The calculation rate of the fault-detection logic loop inside the ABB 1MRK002812-AC matches design-specified internal backplane bus communication velocity constraints. When linking grid measurement parameters over station-level networks or upper communication links utilizing Profinet or EtherNet/IP deterministic networks, the hardware logs events with millisecond timestamp resolution without packet dropping. The protection structure is designed to function smoothly through severe system expansion phases involving aggressive I/O density scaling, provided all added analog sub-cards maintain absolute synchronization with the main chassis firmware flash compatibility registers.

Frequently Asked Questions

Q: Can the internal power supply or analog measurement boards of the REL670 be extracted or serviced via hot-swap methods while the system is under load?

A: No. The line distance protection assembly does not support hot-swap insertion or extraction while energized. Isolating modules under active states can interrupt secondary current transformer paths, causing high-voltage inductive arcing, complete terminal block breakdown, and permanent physical trace damage.

Q: How is a firmware flash compatibility warning managed when swapping a faulty processing module?

A: Hardware revision and software parameters must be verified prior to slot entry using the system terminal calibration tool. An unauthorized mismatch between module sub-assemblies halts initialization to prevent erroneous relay pickup sequences or random contact actuation.

Field Installation Guidelines

  1. ESD Grounding Protection: Maintenance engineers must wear a properly adjusted and grounded electrostatic discharge (ESD) wrist strap prior to opening the internal terminal structure or handling option slots to prevent micro-circuit failure.
  2. Current Transformer Termination Sequence: Ensure all secondary current transformer circuits are physically shorted through external shorting bars before connecting any terminal wiring leads to the analog input block.
  3. Signal Conduit Separation Rules: Route all network fiber-optic leads and low-voltage digital signaling lines through separate shielded wireways. Maintain a minimum separation of 100 mm from high-voltage primary AC power routing paths to reject cross-talk and inductive noise.
  4. Enclosure Gasket Compression: Mount the terminal assembly flush against the panel rack framework. Torque all front retention studs to establish complete grounding contact and seal the panel face to standard industrial limits against dust intrusion.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Understanding Remote Terminal Units: The Core of SCADA and Telemetry Systems

Understanding Remote Terminal Units: The Core of SCADA and Telemetry Systems

In industrial automation, engineers often debate the choice between a Programmable Logic Controller (PLC) and...
Read more
Ultimate Guide to Schneider Electric PLCs: Selecting Control Systems for Small to Medium Automation

Ultimate Guide to Schneider Electric PLCs: Selecting Control Systems for Small to Medium Automation

Schneider Electric remains a dominant force in global industrial automation, delivering robust control systems across diverse sectors. For control engineers, selecting the right programmable logic controller (PLC) requires balancing budget, communication ports, and processing power. This technical breakdown explores Schneider’s small and medium portfolio, offering field-tested insights to help you optimize your next factory automation project.

Read more
Essential Maintenance Guide for PLC, DCS, and ESD Marshalling Cabinets

Essential Maintenance Guide for PLC, DCS, and ESD Marshalling Cabinets

Marshalling cabinets serve as the vital interface between field instrumentation and your core control systems. In large-scale industrial automation, these panels house the intricate wiring for PLC, DCS, and Emergency Shutdown (ESD) systems. Regular, systematic health checks are non-negotiable to ensure operational reliability and prevent costly unplanned downtime.

Read more