Skip to content

What are you looking for?


You may also like

ABB PDP800 Profibus DP V0/V1/V2 Master ModuleABB PDP800 Profibus DP V0/V1/V2 Master ModuleABB PDP800 Profibus DP V0/V1/V2 Master Module
ABB PDP800 Profibus DP V0/V1/V2 Master Module
ABB PDP800 Profibus DP V0/V1/V2 Master Module
ABB PDP800 Profibus DP V0/V1/V2 Master Module

ABB PDP800 Profibus DP V0/V1/V2 Master Module


Only 10 left - Selling fast

PRODUCT SKU : PDP800

PRODUCT TYPE : Communication Modules

PRODUCT VENDOR : ABB


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

The ABB PDP800, also cataloged as the PDP800 Communication Module, operates as a dedicated hardware component for Profibus network orchestration and cyclical fieldbus data exchange within ABB automation systems.

Hardware Specifications

Parameter Specification
Model PDP800
Brand ABB
Origin Lithuania
Weight 0.85 kg (Standard module baseline; net weight omitted in raw logistics logs)
Dimensions 170.18 mm x 73.66 mm x 243.84 mm
Operating Temp 0 to +60 deg C (Standard industrial parameters)
Power Consumption Internally derived via backplane interface assembly
Product Type Communication Modules
Protocol Support Profibus DP V0 / V1 / V2 Master implementation
RoHS Compliance Following EU Directive 2011/65/EU
WEEE Category 5. Small Equipment (No External Dimension More Than 50 cm)

Profinet / EtherNet/IP Deterministic Networks and I/O Density Scaling

The internal processor architecture of the PDP800 coordinates the master schedule for cyclic (DP V0) and acyclic (DP V1/V2) slave telemetry over the physical bus layout. This subsystem isolates local transmission cycles from the host backplane bus communication velocity, mitigating communication jitter. When integrated into multi-protocol architectures adjacent to Profinet / EtherNet/IP deterministic networks, the master module maps slave register registers directly to host variables without modifying controller processing loops. This processing layer ensures firmware flash compatibility with upstream systems while allowing expanded I/O density scaling across a maximum network slave allocation.

Frequently Asked Questions

Q: Does the PDP800 master module permit online hot-swap extraction under active polling states?

A: Physical extraction of the master module while the network is active is restricted. Unless a redundant master module configuration is specifically implemented on the backplane, unmounting the active master drops the entire fieldbus network loop, resulting in immediate slave communication diagnostics errors.

Q: How is firmware flash compatibility verified when executing a field replacement?

A: The system software cross-references the internal firmware revision block stored within the module EEPROM against the host controller software version. Parity must be verified through the hardware configuration editor before downloading active network logic maps to the new module.

Q: Are individual physical slave node configurations preserved locally inside the PDP800 hardware?

A: No. The master module functions as an execution interface; all slave node configurations, GSD parameters, and register mapping architectures are pushed down to the volatile register arrays of the module from the host processor during initial startup initialization.

Field Installation Guidelines

  • Chassis Insertion Alignment: Insert the card vertically into the assigned backplane chassis sub-slot. Slide the unit smoothly along the integrated guide tracks until the rear edge connectors seat into the backplane pin matrix.
  • Network Cable Shielding Terminal: Terminate the Profibus copper media shield braid through the grounded outer ring of the DB9 connection plug. Ground the communication bus directly to the common cabinet earthing strip to prevent line distortion.
  • Line Termination Selection: Ensure that active termination networks are switched on at both physical ends of the Profibus cable segment. Failure to properly terminate the line induces signal reflection waves that corrupt the DP V0/V1/V2 communication frames.
  • Thermal Boundary Clearances: Verify that adjacent equipment placement maintains the standard ventilation layout around the 73.66 mm housing dimension. Air circulation must be clear to prevent thermal stress within the enclosure.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Executing a PLC System Site Acceptance Test (SAT): The Definitive Engineering Guide

Executing a PLC System Site Acceptance Test (SAT): The Definitive Engineering Guide

The transition of a Programmable Logic Controller (PLC) cabinet from a controlled factory floor to a volatile plant environment represents a critical milestone in factory automation. While a Factory Acceptance Test (FAT) validates standalone hardware compliance under ideal conditions, it cannot replicate real-world process dynamics. Therefore, deploying an industrial automation system requires a rigorous Site Acceptance Test (SAT) to verify total loop integrity, field wiring wiring metrics, and process control parameters before final customer handover.

Read more
Advanced Integration: Master Protocol for VFD Commissioning and Testing

Advanced Integration: Master Protocol for VFD Commissioning and Testing

Deploying variable frequency drives (VFDs) requires precise execution during the initial commissioning phase. Junior automation engineers often find the first power-up sequence intimidating. However, following a rigorous engineering framework ensures equipment safety and system reliability. Proper startup procedures protect both the drive electronics and the connected motor.

Read more
Optimizing Factory Automation: The Definitive Guide to VFD Preventive Maintenance

Optimizing Factory Automation: The Definitive Guide to VFD Preventive Maintenance

Variable Frequency Drives (VFDs) serve as critical assets in modern industrial automation. These power electronic devices regulate electric motors by adjusting the supplied frequency and voltage. Consequently, industries utilize VFDs to reduce energy consumption and optimize process control. Major manufacturers like Siemens, ABB, and Yaskawa design highly efficient drives. However, sustained efficiency requires a rigorous preventive maintenance program.

Read more