Skip to content

What are you looking for?


You may also like

1MRK002239-BBr03 Power Supply Module | ABB1MRK002239-BBr03 Power Supply Module | ABB1MRK002239-BBr03 Power Supply Module | ABB
1MRK002239-BBr03 Power Supply Module | ABB
1MRK002239-BBr03 Power Supply Module | ABB
1MRK002239-BBr03 Power Supply Module | ABB

1MRK002239-BBr03 Power Supply Module | ABB


Only 10 left - Selling fast

PRODUCT SKU : 1MRK002239-BBr03

PRODUCT TYPE : Power Supply Modules

PRODUCT VENDOR : ABB


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

The ABB 1MRK002239-BBr03, also cataloged as the 1MRK002239-BB Power Supply Module (PSM), operates as a dedicated hardware component for auxiliary power regulation within ABB protection relay platforms.

Hardware Specifications

Parameter Specification
Model 1MRK002133-ACr06
Brand ABB
Origin Switzerland
Weight 1.52 kg
Dimensions 74 mm x 370 mm x 361 mm
Operating Temp -25 to +70 deg C (Standard Industrial Range)
Power Consumption Self-Consuming Power Conversion Assembly
Input Voltage Range 90-250 VDC
Output Voltage Regulated Internal System DC Voltage
Global Commercial Alias PSM
Product Type Power Supply Module

Backplane Bus Communication Velocity & I/O Density Scaling

The power supply module converts high-voltage wide-range DC inputs (90-250 VDC) into regulated low-voltage rails distributed across internal backplane buses. Maintaining constant DC rail stability ensures high backplane bus communication velocity and continuous data integrity during maximum I/O density scaling. Integrated over-voltage and thermal limiting circuits maintain firmware flash compatibility across host processors, protecting attached logic processing assemblies from input line voltage fluctuations.

Frequently Asked Questions

Q: What is the permissible DC input voltage range for the 1MRK002239-BBr03 power supply card?

A: The module accepts a wide input range from 90 VDC to 250 VDC to convert power for internal system electronics.

Q: How is output power distributed from the 1MRK002239-BBr03 card to other relay boards?

A: Regulated DC power is fed directly into the host rack backplane bus, energizing adjacent processing, communication, and I/O cards.

Field Installation Guidelines

  • Disconnect all primary 90-250 VDC auxiliary power sources before inserting or extracting the power supply card from the rack frame.
  • Ensure protective earth grounding points on the chassis faceplate are tightly fastened to prevent high-voltage transient coupling.
  • Verify proper clearance around rack ventilation slots to allow convection cooling across internal power dissipation components.
  • Torque module retention screws to recommended panel specifications to prevent vibration induced disengagement from backplane connectors.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
FAT vs SAT in Industrial Control Systems: Key Differences and Execution Guide

FAT vs SAT in Industrial Control Systems: Key Differences and Execution Guide

Industrial control system deployment relies on strict verification protocols to guarantee operational safety, system stability, and regulatory compliance. Commissioning complex Programmable Logic Controller (PLC) racks, Distributed Control Systems (DCS), and Safety Instrumented Systems (SIS) requires two critical milestones: the Factory Acceptance Test (FAT) and the Site Acceptance Test (SAT). Both procedures validate that system automation meets design specifications, but they occur at different stages of project execution and target distinct operational risks.

Read more
Hub vs Switch vs Router in Industrial Automation Architecture

Hub vs Switch vs Router in Industrial Automation Architecture

Modern factory automation relies on reliable industrial networking infrastructure to exchange real-time field data across operational technology systems. Engineers often encounter networking hardware like hubs, switches, and routers when integrating Programmable Logic Controllers, Distributed Control Systems, and SCADA monitoring nodes. Although these devices share physical ports, they operate at different layers of the Open Systems Interconnection reference model and deliver distinct traffic management capabilities.

Read more
Marshalling Cabinet Preventive Maintenance: Essential Healthiness Checks for PLC, DCS, and ESD Systems

Marshalling Cabinet Preventive Maintenance: Essential Healthiness Checks for PLC, DCS, and ESD Systems

Marshalling cabinets serve as the vital interface between field instrumentation and control room electronics in modern process facilities. Regular preventive maintenance of these cabinets ensures signal integrity across programmable logic controllers (PLCs), distributed control systems (DCS), and emergency shutdown (ESD) networks. System technicians must execute structured inspection protocols to mitigate environmental risks, identify loose wiring, and maintain continuous operational readiness.

Read more