{"product_id":"3hne00188-1-09-abb-priority-express-cable","title":"3HNE00188-1\/09 ABB Priority Express Cable","description":"\u003cp\u003eConfigured for high-speed signal transmission in S4C robot controller environments, the \u003cstrong\u003eABB 3HNE00188-1\/09\u003c\/strong\u003e (\u003cstrong\u003e3HNE00188-1\/09\u003c\/strong\u003e Robotic Teach Pendant Cable) provides direct physical\/electrical execution. The cable assembly interfaces the handheld teach pendant to the main cabinet logic sub-rack, transferring serial data, safety interlock circuit loops, and emergency stop signals across a 10 m flexible harness.\u003c\/p\u003e\n\u003ch3\u003eHardware Specifications\u003c\/h3\u003e\n\u003cfigure class=\"table\"\u003e\n\u003ctable\u003e\n\u003cthead\u003e\n\u003ctr\u003e\n\u003cth\u003e\u003cstrong\u003eParameter\u003c\/strong\u003e\u003c\/th\u003e\n\u003cth\u003e\u003cstrong\u003eSpecification\u003c\/strong\u003e\u003c\/th\u003e\n\u003c\/tr\u003e\n\u003c\/thead\u003e\n\u003ctbody\u003e\n\u003ctr\u003e\n\u003ctd\u003eModel\u003c\/td\u003e\n\u003ctd\u003e3HNE00188-1\/09\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eBrand\u003c\/td\u003e\n\u003ctd\u003eABB\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eOrigin\u003c\/td\u003e\n\u003ctd\u003eGlobal Manufacturing Facilities\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eWeight\u003c\/td\u003e\n\u003ctd\u003e1.32 kg\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eDimensions\u003c\/td\u003e\n\u003ctd\u003e10 m length\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eOperating Temp\u003c\/td\u003e\n\u003ctd\u003e-10 deg C to +55 deg C\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003ePower Consumption\u003c\/td\u003e\n\u003ctd\u003ePassive wiring component (0 W)\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eCable Type\u003c\/td\u003e\n\u003ctd\u003eRobotic Teach Pendant Cable\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eSystem Compatibility\u003c\/td\u003e\n\u003ctd\u003eABB S4C Robot Controllers\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003c\/tbody\u003e\n\u003c\/table\u003e\n\u003c\/figure\u003e\n\u003ch3\u003eBackplane Bus Communication Velocity \u0026amp; I\/O Density Scaling\u003c\/h3\u003e\n\u003cp\u003eThe 3HNE00188-1\/09 cable assembly maintains backplane bus communication velocity between the teach pendant processor and the main controller rack. High-density twisted-pair wiring combined with continuous braid shielding limits electromagnetic interference (EMI) during dynamic robot movements. The structural pin layout supports target I\/O density scaling across safety stop circuits and serial communication lines without introducing packet latency or signal attenuation over the 10 m span.\u003c\/p\u003e\n\u003ch3\u003eFrequently Asked Questions\u003c\/h3\u003e\n\u003cp\u003eQ: Does the 3HNE00188-1\/09 cable support hot-plugging of the teach pendant during active controller operation?\u003c\/p\u003e\n\u003cp\u003eA: Disconnecting the cable interrupts the dedicated emergency stop safety loop, causing an immediate hard stop of the robot system. The controller must be placed in a safe state prior to disconnect.\u003c\/p\u003e\n\u003cp\u003eQ: How is electromagnetic interference (EMI) mitigated along the 10 m run?\u003c\/p\u003e\n\u003cp\u003eA: Shielded twisted-pair conductors and overall braided copper shielding isolate low-voltage data communication lines from external industrial electrical noise.\u003c\/p\u003e\n\u003cp\u003eQ: What physical precautions prevent connector pin damage during mating?\u003c\/p\u003e\n\u003cp\u003eA: The heavy-duty multipin connectors utilize mechanical alignment keyways and outer latching collars to enforce correct orientation and strain relief upon insertion.\u003c\/p\u003e\n\u003ch3\u003eField Installation Guidelines\u003c\/h3\u003e\n\u003cp\u003eFollow these technical steps during installation and routing:\u003c\/p\u003e\n\u003col\u003e\n\u003cli\u003eElectrical Isolation: Power down the S4C controller cabinet before connecting or disconnecting the teach pendant cable assembly to prevent contact arc damage.\u003c\/li\u003e\n\u003cli\u003eRoute Inspection: Lay out the 10 m cable run avoiding sharp metal edges, tight bend radii below specified limits, or vehicle traffic paths.\u003c\/li\u003e\n\u003cli\u003eConnector Mating: Align the connector keyways carefully with the controller panel socket. Push firmly into place and engage the locking latch or threaded collar completely.\u003c\/li\u003e\n\u003cli\u003eEarth Bonding: Verify that the cable connector housing contacts the cabinet panel grounding ring to ensure continuous shield grounding against field electrical noise.\u003c\/li\u003e\n\u003c\/ol\u003e","brand":"ABB","offers":[{"title":"Default Title","offer_id":53434295353653,"sku":"3HNE00188-1\/09","price":66.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0973\/7630\/5461\/files\/3HNE00188-109.png?v=1788157231","url":"https:\/\/www.5gplc.com\/products\/3hne00188-1-09-abb-priority-express-cable","provider":"High Five PLC Solution Limited","version":"1.0","type":"link"}